Technical design drawings for Manchester Road, Burnley - Accessible and Vibrant Town Centre project

Overview

Latest designs

Project designs were updated following public and stakeholder engagement in 2024. These technical drawings reflect the latest proposals which have been submitted to government in 2025 as part of the Full Business Case for the programme.

The technical design drawings here show the proposed improvements as part of the Accessible and Vibrant Town Centre project for Manchester Road, Burnley.

Please note, these are large PDF files and may use a lot of data.

  1. Manchester Road design drawing 1 of 4
  2. Manchester Road design drawing 2 of 4
  3. Manchester Road design drawing 3 of 4
  4. Manchester Road design drawing 4 of 4

 

Audiences

  • Anyone from any background

Interests

  • 2024 survey